Special Non
Basic Info.
Model NO. | zlp200/zlp500/zlp630/zlp800/zlp1000 |
Material | Galvanized Steel |
Type | Elevator Installation Suspended Platform |
Max. Lifting Height | 300 M |
Voltage | 220-440V, 50-60Hz, 3phase |
Operate System | Electrical, Auto, Manual |
Model Number | Zlp250 Zlp500 Zlp630 Zlp800 Zlp1000 |
Matrial | Steel, Aluminum Alloy |
Length of Platform | From 1m to 10m |
Surface Treatment | Painted, Hot Galvanized |
Wire Rope Dia | 8.3/8.6/9.1/9.3/10.2mm |
Safety Lock | Ls 30, 20-30kn.M |
Colors | Red/Blue/Silver/Orange |
Transport Package | Container |
Specification | According to product |
Trademark | xingdou |
Origin | Shandong, China (Mainland) |
Production Capacity | 5000sets/Year |
Product Description
Welcome to Shandong Xingdou Intelligent Equipment Co.,Ltd.
we are professional manufacturer,Our products are construction lifts, tower crane, suspension platform and Car parking system,We can do OEM for Our customers,Welcome agent or distributor all over the world with most attractive profit and long last cooperation partnership.
Technical parameters
Name | Technical Parameter | ||||
Type | ZLP500 | ZLP630 | ZLP800 | ZLP1000 | |
Rated Load | 500kg | 630kg | 800kg | 1000kg | |
Platform Sise (LxWxH) | (2.5+2.5)x0.69x1.18m | (2+2+2)x0.69x1.18m | (2.+2+2+1.5)x0.69x1.18m | (2+2+2+1.5)x0.69x1.18m | |
Platform material | Aluminum Alloy type, steel type with hot galvanized,steel type with painting | ||||
Wire Rope Height | 0-200m | ||||
Electrical Cable | (3x2.5+2x1.5mm2 )0-200m | ||||
Working height | 0-200m | ||||
Steel rope (specially-made) | 4pcsx100m | 4pcsx100m | 4pcsx100m | 4pcsx100m | |
Ф8.3mm Galvanized | Ф8.3mm Galvanized | Ф8.6mm Galvanized | Ф9.1mm Galvanized | ||
Hoisting Machinery (Copper winding) | Hoist Model | LTD5.0 | LTD6.3 | LTD8.0 | LTD10.0 |
Motor power | 1.5kwx2 | 1.5kwx2 | 1.8kwx2 | 2.2kwx2 | |
Brake Torque | 15KN | 15KN | 15KN | 15KN | |
Lifting speed | 9.3m/min ± 5% | ||||
Safety Lock | Model | LSG20 | LSG20 | LSG30 | LSG30 |
Permission force of impact | 20KN | 20KN | 30KN | 30KN | |
Locking Cable Angle | 3°~8° | ||||
Suspension mechanism Hot Galvanized | Front beam overhang | 1.3 m | |||
Support adjustable height | 1.1~1.6m | ||||
Power Source | 380V/50HZ 3Phase, 220V/60HZ 3Phase , 220V/60HZ single phase | ||||
Counterweight | 750kg | 900kg | 1000kg | 1200kg | |
Qty of 1-20"GP Container | 10 sets | 10 sets | 10 sets | 9 sets |
Main Parts of Suspended Platform
1. construction cradle(basket): Steel or Aluminum Alloy (painted or hot galvanized)2. Suspension Mechanism: Steel (painted or hot galvanized)3. Electric hoists:LTD6.3 or LTD84. Safety Lock: LST305. Electric control box: Along with hoists6. Steel wire rope: 8.3mm ,8.6mm or 9.1mm7. Safety rope: 18mm,20mm8. Electric cable: 3*2.5+2*1.59. Counterweights: Cement , cement with steel cover & Iron counterweight10. Spare parts
Packing and Shipping
Packages Details of Suspended Platform for high buildings and windows cleaning
package | platform | counter weight | hoist & safety lock | control panel & other smallparts |
film | pallet | wooden case | carton box |
Our Company
The Suspended Platform can be customized according to customers'requirements(drawing, specifications and so on).
FAQ1. How much is this suspended platform?Price will offer you immediately after telling us your requirements of loading capacity, material and voltage.2. Are you a factory or trading company?We are direct factory with 40,4000 square meters factory and supply qualified products with factory price.3. What quality certificate you own for your products?Our products own CCC, CE and ISO9001 certificate.4. How about the price?Please send us inquiry, a consideration solution or preferable will be sent within 24 hours.5. Payment term?T/T or L/C at sight.6. Spare parts & guarantee?If any parts get damaged because of quality within 12 months after shipping date. We will send new parts to replace right away.7. Can you make suspended platform with our brand?Yes.8. Delivery time?According to order quantity, 10-20 working days will be finished after getting the deposit.